With just a short time between their lease ending, and being able to move into their new space, much of the construction had to be done themselves.
They had the concrete floors polished and sealed to provide the most durable surface possible for the constant moving of furniture.
Then, the floors were covered, the walls and ceilings were finished, a counter was built, the intake room was created, a public restroom was built, and a sliding barn door was constructed using reclaimed wood from their previous location.
By October of 2017, the new location was open for business.
